1 00:00:12,169 --> 00:00:10,549 three heavy space vehicles are being 2 00:00:15,499 --> 00:00:12,179 developed by the National Aeronautics 3 00:00:19,910 --> 00:00:15,509 and Space Administration under the 4 00:00:23,900 --> 00:00:19,920 project name Saturn the largest Saturn 5 00:00:31,880 --> 00:00:23,910 vehicle designated Saturn five consists 6 00:00:37,840 --> 00:00:31,890 of three stages the s 1 C using 5 f 1 7 00:00:43,459 --> 00:00:37,850 engines the s 2 with 5 J 2 engines and 8 00:00:47,299 --> 00:00:43,469 the S 4 be using a single j2 engine plus 9 00:00:50,150 --> 00:00:47,309 the vehicle instrument unit and the 10 00:00:54,439 --> 00:00:50,160 Apollo spacecraft which saturn v will 11 00:00:56,569 --> 00:00:54,449 carry this second quarterly film report 12 00:00:59,740 --> 00:00:56,579 will cover progress on the Saturn 5 13 00:01:03,009 --> 00:00:59,750 vehicle during February March and April 14 00:01:05,630 --> 00:01:03,019 1963 highlighting major effort 15 00:01:07,700 --> 00:01:05,640 concentrated in areas of final tooling 16 00:01:11,539 --> 00:01:07,710 preparation and initiation of 17 00:01:14,830 --> 00:01:11,549 fabrication an important step in 18 00:01:17,450 --> 00:01:14,840 development of saturn v s/s 1c stage 19 00:01:19,640 --> 00:01:17,460 represented here by a 120th scale 20 00:01:22,429 --> 00:01:19,650 cutaway model was work during this 21 00:01:24,469 --> 00:01:22,439 report period on fabrication of bulkhead 22 00:01:29,749 --> 00:01:24,479 components for the liquid oxygen and 23 00:01:32,240 --> 00:01:29,759 fuel tanks the initial bulkhead core 24 00:01:34,399 --> 00:01:32,250 segments were formed in early february 25 00:01:36,260 --> 00:01:34,409 by the military aircraft systems 26 00:01:38,990 --> 00:01:36,270 division of the boeing company at 27 00:01:41,090 --> 00:01:39,000 wichita kansas heavy rollers first 28 00:01:43,460 --> 00:01:41,100 pressed sheets of aluminum alloy to the 29 00:01:45,950 --> 00:01:43,470 approximate required contour gore 30 00:01:50,749 --> 00:01:45,960 segments are made in two sections base 31 00:01:52,670 --> 00:01:50,759 and apex later welded together the 32 00:01:56,060 --> 00:01:52,680 rolled sections are then placed in this 33 00:01:58,160 --> 00:01:56,070 large bulge form die or final precision 34 00:02:01,069 --> 00:01:58,170 shaping through use of liquid pressure 35 00:02:03,289 --> 00:02:01,079 in a rubber bladder water is forced into 36 00:02:06,350 --> 00:02:03,299 the bladder by a pump as the bladder 37 00:02:09,290 --> 00:02:06,360 expands it forms the aluminum against a 38 00:02:14,710 --> 00:02:09,300 plastic liner at a maximum of 1,500 39 00:02:19,580 --> 00:02:16,940 upon delivery to the Marshall Center 40 00:02:23,630 --> 00:02:19,590 Gore segments our first heat treated or 41 00:02:25,910 --> 00:02:23,640 aged in a large oven for 24 hours at 325 42 00:02:27,979 --> 00:02:25,920 degrees Fahrenheit to increase their 43 00:02:29,630 --> 00:02:27,989 strength and hardness before they 44 00:02:31,970 --> 00:02:29,640 undergo the fabrication and assembly 45 00:02:35,839 --> 00:02:31,980 processes which will result in a 46 00:02:37,729 --> 00:02:35,849 finished bulkhead Marshalls bulkhead 47 00:02:39,830 --> 00:02:37,739 fabrication and assembly tooling 48 00:02:41,780 --> 00:02:39,840 underwent continued buildup in 49 00:02:44,210 --> 00:02:41,790 qualification during the report period 50 00:02:46,190 --> 00:02:44,220 with work also underway on the first 51 00:02:49,009 --> 00:02:46,200 bulkhead which will be part of a 52 00:02:50,660 --> 00:02:49,019 structural test fuel tank this initial 53 00:02:53,030 --> 00:02:50,670 station in the bulkhead assembly line 54 00:03:00,440 --> 00:02:53,040 performs routing and welding for all 55 00:03:03,289 --> 00:03:00,450 ghor fittings the second tooling fixture 56 00:03:05,449 --> 00:03:03,299 trims the top edge of the base and the 57 00:03:08,360 --> 00:03:05,459 bottom edge of the apex of each core 58 00:03:15,020 --> 00:03:08,370 segment in order to make a joint to weld 59 00:03:17,780 --> 00:03:15,030 the two pieces together at the third 60 00:03:20,420 --> 00:03:17,790 station this Gore welding fixture is 61 00:03:23,390 --> 00:03:20,430 used to join the Gore's base and apex 62 00:03:26,300 --> 00:03:23,400 portions mounted over a pit the welding 63 00:03:28,610 --> 00:03:26,310 platform can be tilted 30 degrees since 64 00:03:36,410 --> 00:03:28,620 it is desirable to weld uphill at all 65 00:03:38,930 --> 00:03:36,420 times at the fourth station a Meridian 66 00:03:41,180 --> 00:03:38,940 edge Gore trim fixture is employed to 67 00:03:45,410 --> 00:03:41,190 perform the job of trimming the gore 68 00:03:48,470 --> 00:03:45,420 segments lengthwise at station number 69 00:03:50,330 --> 00:03:48,480 five Gore's are installed on the 70 00:03:52,720 --> 00:03:50,340 bulkhead welding and assembly fixture 71 00:03:56,020 --> 00:03:52,730 where four operations take place 72 00:03:59,809 --> 00:03:56,030 Meridian weld bulkhead base trim 73 00:04:02,420 --> 00:03:59,819 bulkhead to Y ring weld and Y ring to 74 00:04:04,340 --> 00:04:02,430 skin weld to gore segments have been 75 00:04:06,740 --> 00:04:04,350 successfully welded together in the 76 00:04:08,539 --> 00:04:06,750 qualification operation eight gore 77 00:04:13,069 --> 00:04:08,549 welding for the first bulkhead is 78 00:04:15,349 --> 00:04:13,079 scheduled next quarter installation of 79 00:04:17,750 --> 00:04:15,359 the final station number six was 80 00:04:19,879 --> 00:04:17,760 completed during the report period check 81 00:04:24,219 --> 00:04:19,889 out of the fixture which will weld in 82 00:04:29,480 --> 00:04:27,440 the s-1 sea stage partial tails 83 00:04:31,160 --> 00:04:29,490 section mock-up has been moved into 84 00:04:33,260 --> 00:04:31,170 Marshalls newly completed mock-up 85 00:04:39,320 --> 00:04:33,270 building from the adjoining shop where 86 00:04:41,660 --> 00:04:39,330 it was fabricated after further build-up 87 00:04:43,880 --> 00:04:41,670 the unit will be installed on his for 88 00:04:46,910 --> 00:04:43,890 support costs during the next report 89 00:04:49,880 --> 00:04:46,920 period and the full-scale f1 engine 90 00:04:52,190 --> 00:04:49,890 mock-up will be attached manual gimbal 91 00:04:54,770 --> 00:04:52,200 in tests of the f1 mock-up have been 92 00:04:57,320 --> 00:04:54,780 performed to evaluate design of flame 93 00:05:05,420 --> 00:04:57,330 curtains compression compensation and 94 00:05:08,150 --> 00:05:05,430 cable installation a 1/8 scale model s1 95 00:05:10,280 --> 00:05:08,160 C liquid oxygen tank is being used at 96 00:05:12,980 --> 00:05:10,290 Marshall to study LOX flow 97 00:05:15,620 --> 00:05:12,990 characteristics and to develop efficient 98 00:05:19,340 --> 00:05:15,630 anti vortex devices such as baffles 99 00:05:22,100 --> 00:05:19,350 screens and stand pipes for testing the 100 00:05:24,490 --> 00:05:22,110 tank is filled with water with dye added 101 00:05:26,800 --> 00:05:24,500 to enhance engineering photography a 102 00:05:29,330 --> 00:05:26,810 rotating paddle is used to simulate 103 00:05:31,580 --> 00:05:29,340 vortexing which might be caused by 104 00:05:33,650 --> 00:05:31,590 vehicle movements in flight thus 105 00:05:36,040 --> 00:05:33,660 preventing sufficient LOX supply to 106 00:05:39,050 --> 00:05:36,050 engines 107 00:05:41,810 --> 00:05:39,060 construction of Marshalls Saturn 5 test 108 00:05:45,740 --> 00:05:41,820 facilities such as this hydrostatic test 109 00:05:47,570 --> 00:05:45,750 and vertical Assembly Building basic 110 00:05:51,140 --> 00:05:47,580 construction of the reinforced concrete 111 00:05:53,450 --> 00:05:51,150 block house or control center some 250 112 00:05:56,810 --> 00:05:53,460 yards from the stand has been completed 113 00:05:58,490 --> 00:05:56,820 and interior work is progressing to 114 00:06:01,570 --> 00:05:58,500 accommodate the electronic test 115 00:06:04,370 --> 00:06:01,580 equipment which will later be installed 116 00:06:06,320 --> 00:06:04,380 the instrumentation tunnel running 117 00:06:08,720 --> 00:06:06,330 between the block house and test stand 118 00:06:12,860 --> 00:06:08,730 is complete and ready for installation 119 00:06:15,530 --> 00:06:12,870 of cables a 40 foot deep excavation for 120 00:06:18,050 --> 00:06:15,540 Marshalls f1 single-engine static test 121 00:06:20,290 --> 00:06:18,060 stand has been finished and preparations 122 00:06:22,940 --> 00:06:20,300 have begun for pouring the foundation a 123 00:06:25,190 --> 00:06:22,950 contract was awarded in February for 124 00:06:29,840 --> 00:06:25,200 construction of the 105 foot tall 125 00:06:32,930 --> 00:06:29,850 concrete superstructure the west side of 126 00:06:35,930 --> 00:06:32,940 Marshalls s1 stage static test stand is 127 00:06:38,480 --> 00:06:35,940 now being modified to test f-1 engines 128 00:06:40,640 --> 00:06:38,490 this will allow start of f1 tests in 129 00:06:41,189 --> 00:06:40,650 November several months earlier than 130 00:06:43,409 --> 00:06:41,199 scheduled 131 00:06:46,709 --> 00:06:43,419 the position will be converted back to 132 00:06:53,189 --> 00:06:46,719 s1 testing after completion of marshals 133 00:06:56,070 --> 00:06:53,199 f1 tests tan a new series of experiments 134 00:06:58,999 --> 00:06:56,080 in rocket sounds was begun at Marshall 135 00:07:01,019 --> 00:06:59,009 this quarter using a new and larger horn 136 00:07:02,939 --> 00:07:01,029 replacing one which was moved to 137 00:07:05,820 --> 00:07:02,949 Marshalls Mississippi test operations 138 00:07:08,670 --> 00:07:05,830 the huge horn which simulates the noise 139 00:07:10,529 --> 00:07:08,680 of a Saturn static firing is being used 140 00:07:12,629 --> 00:07:10,539 to learn more about the transmission of 141 00:07:13,860 --> 00:07:12,639 this low-frequency sound and to 142 00:07:17,010 --> 00:07:13,870 determine the most advantageous 143 00:07:21,320 --> 00:07:17,020 conditions for conducting static firings 144 00:07:26,700 --> 00:07:24,029 experiments in partially suppressing the 145 00:07:29,040 --> 00:07:26,710 noise of Saturn firings are also being 146 00:07:31,050 --> 00:07:29,050 conducted at the centre by firing a 147 00:07:37,050 --> 00:07:31,060 small engine into a specially 148 00:07:39,749 --> 00:07:37,060 constructed water tank microphones set 149 00:07:42,149 --> 00:07:39,759 up on a semicircle of sixteen poles near 150 00:07:50,279 --> 00:07:42,159 the tank record sound levels during 151 00:07:53,070 --> 00:07:50,289 firing various deflector calm and baffle 152 00:07:55,260 --> 00:07:53,080 devices inside the water tank help to 153 00:07:59,159 --> 00:07:55,270 dissipate the energy which creates the 154 00:08:02,040 --> 00:07:59,169 noise the tape recorded sound is later 155 00:08:08,869 --> 00:08:02,050 analyzed by technicians to determine the 156 00:08:11,670 --> 00:08:08,879 effectiveness of suppression a new jet 157 00:08:13,829 --> 00:08:11,680 impingement test facility was placed in 158 00:08:15,959 --> 00:08:13,839 operation this quarter to study the 159 00:08:17,959 --> 00:08:15,969 feasibility of launching space vehicles 160 00:08:20,489 --> 00:08:17,969 directly over a large body of water 161 00:08:23,700 --> 00:08:20,499 small solid propellant motors are 162 00:08:26,219 --> 00:08:23,710 presently being used in tests later f1 163 00:08:29,369 --> 00:08:26,229 models will be fired singly and in 164 00:08:32,759 --> 00:08:29,379 clusters the stand is designed for up to 165 00:08:35,309 --> 00:08:32,769 50,000 pounds thrust its platform can be 166 00:08:40,290 --> 00:08:35,319 varied from 0 to 10 feet above water 167 00:08:43,170 --> 00:08:40,300 surface portholes in the tank allow for 168 00:08:46,019 --> 00:08:43,180 photographic instrumentation the tank is 169 00:08:54,440 --> 00:08:46,029 51 feet in diameter 24 feet deep and 170 00:08:59,100 --> 00:08:57,420 splash effects jet penetration depths 171 00:09:03,630 --> 00:08:59,110 and effects of underwater deflectors 172 00:09:05,970 --> 00:09:03,640 will be study at the Boeing Company 173 00:09:08,460 --> 00:09:05,980 plant in Seattle Washington dynamic 174 00:09:10,950 --> 00:09:08,470 calibration tests using a three 100 175 00:09:13,470 --> 00:09:10,960 scale Saturn 5 model were performed this 176 00:09:15,780 --> 00:09:13,480 quarter an electrical shaker device with 177 00:09:17,990 --> 00:09:15,790 rod attachment induced vibration under 178 00:09:21,150 --> 00:09:18,000 controlled frequencies and amplitudes 179 00:09:23,550 --> 00:09:21,160 the same model with weight suspended to 180 00:09:25,800 --> 00:09:23,560 introduce linear deflection was also 181 00:09:30,570 --> 00:09:25,810 used in static calibration tests to 182 00:09:32,640 --> 00:09:30,580 measure vehicle bending moments a 120th 183 00:09:35,250 --> 00:09:32,650 scale model equipped with two receiving 184 00:09:37,140 --> 00:09:35,260 antennas was used in command destruct 185 00:09:39,810 --> 00:09:37,150 antenna pattern measurements to 186 00:09:41,310 --> 00:09:39,820 determine vehicle aspect angles over 187 00:09:44,280 --> 00:09:41,320 which the destruct signal can be 188 00:09:45,900 --> 00:09:44,290 received at Marshall's miss shoe 189 00:09:48,840 --> 00:09:45,910 operations in New Orleans 190 00:09:50,990 --> 00:09:48,850 the first s1 C stage Y ring was 191 00:09:53,820 --> 00:09:51,000 completed by Boeing in mid-february 192 00:09:56,070 --> 00:09:53,830 using the recently installed 42 foot 193 00:09:59,130 --> 00:09:56,080 boring mill to machine the ring to 194 00:10:01,380 --> 00:09:59,140 precise measurements machining of the 195 00:10:04,800 --> 00:10:01,390 second y ring has now also been 196 00:10:06,870 --> 00:10:04,810 completed the initial ring was removed 197 00:10:08,730 --> 00:10:06,880 from the boring mill for shipment to the 198 00:10:13,890 --> 00:10:08,740 Marshall Center where it will become 199 00:10:16,590 --> 00:10:13,900 part of the structural test tank machine 200 00:10:18,870 --> 00:10:16,600 marks in the open V cut on the top of 201 00:10:21,750 --> 00:10:18,880 the ring were removed by hand grinding 202 00:10:27,270 --> 00:10:21,760 the V forms the junction of the bulkhead 203 00:10:29,550 --> 00:10:27,280 and the inter tank or inter stage the 204 00:10:31,650 --> 00:10:29,560 two-ton ring was carefully wrapped and 205 00:10:36,390 --> 00:10:31,660 sealed to provide protection during 206 00:10:39,390 --> 00:10:36,400 handling and shipping the ring was 207 00:10:41,850 --> 00:10:39,400 shipped by barge from Mishu on February 208 00:10:47,970 --> 00:10:41,860 22nd and arrived at the Marshall Center 209 00:10:50,280 --> 00:10:47,980 ten days later work on misuse s1c 210 00:10:52,470 --> 00:10:50,290 vertical assembly building continued 211 00:10:54,600 --> 00:10:52,480 this quarter with relocation and 212 00:10:57,720 --> 00:10:54,610 installation of underground pipe and 213 00:10:59,730 --> 00:10:57,730 electric cables accomplished the 214 00:11:01,680 --> 00:10:59,740 foundation for the hydrostatic testing 215 00:11:04,500 --> 00:11:01,690 and cleaning pad was also under 216 00:11:06,689 --> 00:11:04,510 construction this is the last station 217 00:11:09,360 --> 00:11:06,699 the booster before it is returned to the 218 00:11:16,590 --> 00:11:09,370 final stage preparation area in the main 219 00:11:19,500 --> 00:11:16,600 plant for outfitting the VAB will have 220 00:11:21,720 --> 00:11:19,510 three turntables with the pits housing 221 00:11:26,790 --> 00:11:21,730 the turntable gears recessed in the 222 00:11:28,680 --> 00:11:26,800 foundation when the building is 223 00:11:31,740 --> 00:11:28,690 completed it will consist of two 224 00:11:34,079 --> 00:11:31,750 sections one for booster assembly and 225 00:11:41,970 --> 00:11:34,089 the other for hydrostatic testing and 226 00:11:44,009 --> 00:11:41,980 cleaning at Rocketdyne f1 engine work 227 00:11:46,639 --> 00:11:44,019 this quarter included assembly of an 228 00:11:49,530 --> 00:11:46,649 experimental concentric tube injector 229 00:11:51,540 --> 00:11:49,540 prior to installing the faceplate the 230 00:11:53,519 --> 00:11:51,550 igniter tubes are placed in the body of 231 00:11:55,920 --> 00:11:53,529 the injector there are 21 of these 232 00:12:03,449 --> 00:11:55,930 elements one for each compartment in the 233 00:12:05,850 --> 00:12:03,459 baffle locks tubes are inserted through 234 00:12:07,710 --> 00:12:05,860 the back of the injector the concentric 235 00:12:10,079 --> 00:12:07,720 fuel tubes and the baffles are then 236 00:12:12,720 --> 00:12:10,089 installed on the face in operation 237 00:12:15,780 --> 00:12:12,730 oxidizer is swirled in the center tube 238 00:12:18,449 --> 00:12:15,790 to form a cone of spray the fuel in the 239 00:12:21,420 --> 00:12:18,459 annular element is impinged on this cone 240 00:12:23,220 --> 00:12:21,430 and mixing occurs since injector 241 00:12:25,769 --> 00:12:23,230 elements are eight different lengths 242 00:12:28,079 --> 00:12:25,779 eight flame fronts are propagated in the 243 00:12:30,449 --> 00:12:28,089 combustion zone it is believed that this 244 00:12:32,699 --> 00:12:30,459 multiple flame front and concentric 245 00:12:38,340 --> 00:12:32,709 injection will increase dynamic 246 00:12:40,379 --> 00:12:38,350 stability testing of model mark 10 247 00:12:42,680 --> 00:12:40,389 inducers was conducted in a water tunnel 248 00:12:44,819 --> 00:12:42,690 under various operating conditions 249 00:12:46,220 --> 00:12:44,829 instrumentation photography permitted 250 00:12:48,870 --> 00:12:46,230 observance of such phenomena as 251 00:12:54,930 --> 00:12:48,880 cavitation backflow and blade tip 252 00:12:57,300 --> 00:12:54,940 vortexing at North American space and 253 00:13:00,120 --> 00:12:57,310 Information Systems Division contractor 254 00:13:01,980 --> 00:13:00,130 for the S two-stage bulkhead tooling was 255 00:13:04,740 --> 00:13:01,990 being installed this quarter in the new 256 00:13:07,050 --> 00:13:04,750 seal Beach California facility including 257 00:13:10,829 --> 00:13:07,060 the bulkhead Gore segment welding tool 258 00:13:12,420 --> 00:13:10,839 dollar weld tool the autoclave which 259 00:13:16,769 --> 00:13:12,430 will provide heat and pressure for 260 00:13:18,060 --> 00:13:16,779 bonding insulation to bulkheads and the 261 00:13:22,140 --> 00:13:18,070 acid bath tank 262 00:13:24,570 --> 00:13:22,150 for the etching Rome the s2 263 00:13:26,820 --> 00:13:24,580 electromechanical mock-up scheduled for 264 00:13:29,640 --> 00:13:26,830 first use in July is being fabricated 265 00:13:32,510 --> 00:13:29,650 and assembled at s and IDs County plan 266 00:13:34,890 --> 00:13:32,520 the mock-up will be used in three areas 267 00:13:36,960 --> 00:13:34,900 manufacturing to check placement of 268 00:13:39,960 --> 00:13:36,970 lines components and engines for 269 00:13:42,120 --> 00:13:39,970 interference and accessibility testing 270 00:13:44,780 --> 00:13:42,130 to check out compatibility of flight 271 00:13:47,910 --> 00:13:44,790 systems as units and with each other and 272 00:13:51,000 --> 00:13:47,920 GSE development to check out automatic 273 00:13:59,760 --> 00:13:51,010 GSE and make check out computer tapes to 274 00:14:02,790 --> 00:13:59,770 be used with flight stages fabrication 275 00:14:04,980 --> 00:14:02,800 of the s2 battleship test stage depicted 276 00:14:07,290 --> 00:14:04,990 here in model form is proceeding on 277 00:14:10,170 --> 00:14:07,300 schedule initial use is set for the 278 00:14:12,660 --> 00:14:10,180 first quarter of 1964 marking the first 279 00:14:15,630 --> 00:14:12,670 time for j2 engines to be fired in 280 00:14:18,390 --> 00:14:15,640 cluster fabrication of the s2 structural 281 00:14:26,610 --> 00:14:18,400 stage for use in checking entire vehicle 282 00:14:29,520 --> 00:14:26,620 structures is also underway at s and IDs 283 00:14:31,860 --> 00:14:29,530 el Toro facility activated this quarter 284 00:14:33,750 --> 00:14:31,870 high energy forming tests have been 285 00:14:36,600 --> 00:14:33,760 successfully performed on waffle 286 00:14:39,690 --> 00:14:36,610 sections of the s2 s common bulkhead the 287 00:14:42,900 --> 00:14:39,700 part to be formed is embedded in a 288 00:14:45,240 --> 00:14:42,910 castable epoxy urethane an explosive 289 00:14:50,070 --> 00:14:45,250 charge of primer cord is used to provide 290 00:14:52,410 --> 00:14:50,080 the shockwave for forming at SATA suzana 291 00:14:54,990 --> 00:14:52,420 roughed site preparation of the coca 292 00:14:57,840 --> 00:14:55,000 area of rocket dean's propulsion field 293 00:14:59,670 --> 00:14:57,850 laboratory has been completed the s2 294 00:15:02,700 --> 00:14:59,680 battleship will be installed in test 295 00:15:05,100 --> 00:15:02,710 stand number one test stand number four 296 00:15:07,590 --> 00:15:05,110 is being prepared for installation of 297 00:15:12,990 --> 00:15:07,600 the all system stage the first flight 298 00:15:16,140 --> 00:15:13,000 wait s to test vehicle at Rocketdyne 299 00:15:19,200 --> 00:15:16,150 contractor for the j2 engine common to 300 00:15:21,420 --> 00:15:19,210 s2 and s4 b stages a relatively new 301 00:15:24,060 --> 00:15:21,430 metal forming technique electrolytic 302 00:15:27,270 --> 00:15:24,070 erosion is being used in manufacture of 303 00:15:29,910 --> 00:15:27,280 j2 injectors the forming die made of 304 00:15:31,890 --> 00:15:29,920 compressed graphite acts as an electrode 305 00:15:37,350 --> 00:15:31,900 and a non conductive 306 00:15:39,210 --> 00:15:37,360 removes the eroded material built up 307 00:15:41,940 --> 00:15:39,220 with facilities for the j2 engine 308 00:15:44,400 --> 00:15:41,950 program at Propulsion Laboratory at 309 00:15:46,560 --> 00:15:44,410 Santa Susana continued during the report 310 00:15:49,680 --> 00:15:46,570 period with work on the liquid hydrogen 311 00:15:55,320 --> 00:15:49,690 storage area run tanks and horizontal 312 00:15:57,740 --> 00:15:55,330 and vertical static test stands at 313 00:15:59,940 --> 00:15:57,750 Douglas Aircraft Company santa monica 314 00:16:02,450 --> 00:15:59,950 fabrication of production tooling 315 00:16:03,750 --> 00:16:02,460 fixtures for Saturn fives third stage 316 00:16:06,300 --> 00:16:03,760 s4b 317 00:16:08,370 --> 00:16:06,310 was well underway this quarter the first 318 00:16:11,370 --> 00:16:08,380 vehicle manufactured will be used for 319 00:16:12,840 --> 00:16:11,380 hydrostatic testing a full scale 320 00:16:15,420 --> 00:16:12,850 engineering mock-up is under 321 00:16:17,910 --> 00:16:15,430 construction or use in verifying flight 322 00:16:22,170 --> 00:16:17,920 type system compatibility with ground 323 00:16:24,600 --> 00:16:22,180 support equipment both tank domes have 324 00:16:27,300 --> 00:16:24,610 been completed and installed in handling 325 00:16:29,550 --> 00:16:27,310 jigs the forward interstate structure 326 00:16:36,240 --> 00:16:29,560 was attached to the forward dome and the 327 00:16:38,040 --> 00:16:36,250 aft skirt to the apt dome work is 328 00:16:39,840 --> 00:16:38,050 proceeding on design and layout of 329 00:16:42,660 --> 00:16:39,850 automatic check out ground support 330 00:16:44,340 --> 00:16:42,670 equipment and its housing facilities for 331 00:16:46,800 --> 00:16:44,350 complete sets of ground support 332 00:16:49,740 --> 00:16:46,810 equipment will be fabricated the testing 333 00:16:51,750 --> 00:16:49,750 program in progress for s4b includes 334 00:16:54,450 --> 00:16:51,760 research development qualification 335 00:16:58,710 --> 00:16:54,460 production and reliability verification 336 00:17:01,320 --> 00:16:58,720 testing construction of the s4 be static 337 00:17:03,330 --> 00:17:01,330 firing test facility complex beta at 338 00:17:06,540 --> 00:17:03,340 Sacramento is progressing satisfactorily 339 00:17:08,970 --> 00:17:06,550 a contract for the battleship tank for 340 00:17:12,990 --> 00:17:08,980 test stand number one was awarded this 341 00:17:14,910 --> 00:17:13,000 quarter at Huntington Beach construction 342 00:17:18,300 --> 00:17:14,920 of the Douglas Space Science Center is 343 00:17:21,360 --> 00:17:18,310 also underway this facility will include 344 00:17:24,270 --> 00:17:21,370 an assembly and hydrostatic test our 345 00:17:26,190 --> 00:17:24,280 mock-up and fabrication building space 346 00:17:30,270 --> 00:17:26,200 simulator and s4b 347 00:17:32,880 --> 00:17:30,280 systems integration area structural 348 00:17:34,950 --> 00:17:32,890 design layout of the Saturn 5 instrument 349 00:17:38,010 --> 00:17:34,960 unit which will be located between the 350 00:17:40,880 --> 00:17:38,020 s4b stage and the Apollo spacecraft is 351 00:17:43,740 --> 00:17:40,890 in process at the Marshall Center 352 00:17:45,560 --> 00:17:43,750 guidance and control tracking and 353 00:17:47,779 --> 00:17:45,570 telemetry equipment will be 354 00:17:50,299 --> 00:17:47,789 around the periphery of the unit which 355 00:17:52,820 --> 00:17:50,309 is three feet high and 21 feet eight 356 00:17:54,919 --> 00:17:52,830 inches in diameter circulation of a 357 00:17:58,669 --> 00:17:54,929 coolant through panels will provide 358 00:18:00,649 --> 00:17:58,679 temperature control the unused volume in 359 00:18:03,320 --> 00:18:00,659 the center will allow the legs of the 360 00:18:05,570 --> 00:18:03,330 Apollo's lunar excursion module to